A good horse is equipped with a good saddle

In order to ensure the stability and consistency of drugs, many pharmaceutical companies need to develop from small experiments to pilot trials and then enter the mass production stage in their industrial production.   However, according to users, in many pharmaceutical equipment fields, such as spray drying, for many years, many scientific researchers did not have suitable pilot equipment after completing small tests.   Generally speaking, the pilot plant needs to consider the process flow, equipment selection, cost control, environmental protection and other issues to make further preparations for subsequent batch equipment.  

 

Take the homogenizing emulsifier equipment as an example, six conditions are generally required for the conversion of a small laboratory test to a pilot test. At the same time, in response to the problems of previous production equipment, pharmaceutical equipment companies have gradually transformed traditional production equipment to intelligent production equipment.   Of course, in addition to the quality of equipment, Screw Thread Syringe Installed Machine manufacturers also need to pay attention to customer suggestions.

 

In response to the equipment needs of each stage, pharmaceutical equipment suppliers generally provide corresponding laboratory test, pilot test and industrial production equipment. As the saying goes, 'A good horse is equipped with a good saddle'. Second, the manufacturing conditions in the pilot test have been determined, and the analytical and inspection methods for the product, intermediates, and process principles have been determined; third, the corrosion resistance tests of the pipe materials of some homogeneous emulsification equipment used in the experiment have been carried out, and The necessary complete sets of equipment are available

 

; fourth, material balance calculations have been carried out, and preliminary treatment methods have been carried out for the three waste problems; fifth, the specifications and unit consumption quantities of raw materials have been proposed; sixth, the requirements for safe production have been proposed